Can I purchase a Mastercraft Flood Vac on my Government Purchase Card?
The Flood Vac is priced at $3,122, which is under every federal, state, and local micropurchase threshold. Whether you can pay by P-card depends on your individual cardholder delegation limit — set by your agency’s Delegation of Procurement Authority letter, not just the FAR ceiling. Most municipal DPW and school district cardholders are authorized for single purchases at this price point. Federal civilian cardholders should confirm their current limit with their A/OPC. If your delegation doesn’t cover it, we also accept Net-30 PO terms and can supply a formal quote within one business day.
What is the federal micropurchase threshold in 2026?
The federal-wide micropurchase threshold under FAR 2.101 is $15,000 as of October 1, 2025, raised from the prior $10,000 threshold. Individual cardholder single-purchase limits are set by each agency’s delegation of procurement authority and are often lower than the FAR ceiling. The Mastercraft Pump-Out Flood Vacuum at $3,122 is well under every threshold at every level.
Is MastercraftUSA registered in SAM.gov?
Yes. The parent entity, Onfloor Technologies LLC, is an Active registered vendor in SAM.gov through January 22, 2027. UEI: GT6MK2BMBHB8. CAGE Code: 8LLL2. Purpose of Registration: All Awards. Physical address: 777 South Street, Newburgh, NY 12550.
Is the Mastercraft Flood Vac Buy American Act compliant?
Yes. The Flood Vac is manufactured in Newburgh, New York from predominantly U.S. components and is Buy American Act (41 U.S.C. §§ 8301–8305) compliant. Buy American certification is included with every quote and every P-card order confirmation.
What makes a pump-out flood vacuum different from a wet/dry shop vacuum?
A standard wet/dry vacuum has a tank. When the tank fills, extraction stops while the operator empties it. A pump-out flood vacuum discharges recovered water continuously through a separate pump-out hose to a drain, sump, or exterior location — extraction does not pause. In a real flood event, that difference is the difference between containing the damage and watching it spread while the tank is being emptied.
How fast can the Mastercraft Flood Vac ship to my agency?
Standard shipping is 3 business days from order confirmation for P-card orders. For PO orders, the same 3-day shipping timeline begins after the PO is acknowledged. Expedited shipping is available on request — contact us before checkout.
Does the Flood Vac come with replacement filter bags?
The machine uses a standard commercial wet/dry filter. No disposable filter bags are required for normal operation. Replacement filters are available separately — contact our Government Division for compatible part numbers.
Can FEMA Public Assistance funds be used to purchase preparedness equipment?
Yes. The FEMA Public Assistance program (44 CFR Part 206) allows state, local, tribal, and territorial governments that have received PA funding to use those funds on emergency protective measures and equipment, including preparedness equipment positioned for future events.
What is included with the Flood Vac?
The standard kit includes the Pump-Out Flood Vacuum unit, a 15-foot CrushProof intake hose, a 50-foot CrushProof intake hose, the pump-out discharge hose, the standard wet/dry filter, and operator documentation.
Do you accept government purchase orders and Net-30 terms?
Yes. We extend Net-30 purchase order terms to verified .gov, .mil, .edu, and .us domain accounts. Quotes are emailed within one business day. We accept payment by P-card, check, ACH, or wire transfer.
Is the Flood Vac available on Sourcewell, OMNIA, or GSA Advantage?
Cooperative contract availability is updated regularly. For the active contract number applicable to your agency, contact us through the Quote path on this page.
Who do I contact for technical specifications or compliance documentation?
Our Government Division is reachable through the Live Chat widget on this page or the quote form. Technical spec sheets, Buy American Act documentation, SAM.gov verification documents, and cooperative contract paperwork are available on request within one business day.